Diaphragm wall methods

Since the mid-1980s, hardly any other method has changed specialist foundation engineering as markedly as the technology of diaphragm wall equipment. One milestone was the introduction of the first Bauer trench cutter in 1984/85. Since then, diaphragm walls have become a standard method in specialist foundation engineering. Today they act as retaining structures or cut-off walls – for example to enclose excavation pits or to seal dams – or as foundation elements with a structural function.

如何建造地下连续墙?

使用沟槽铣挖机或地下连续墙抓斗建造多个矩形独立构件(面板)并相互连接,形成连续墙体。明沟由泥浆支撑。这种方法可以防止地下水渗入以及现有土壤随之破裂。沟槽铣挖机或连续墙抓斗等挖掘工具的选择主要取决于土壤条件和沟槽深度。 

Diaphragm wall method: Cut-off wall

为在美国平台YouTube上播放视频,我们需要您同意相关数据处理,具体内容详见我们的数据保护声明。

Are you interested in learning how a cut-off wall is constructed? Then watch the film and learn more about our diaphragm wall methods.

Diaphragm wall with cutter

Trench cutters are especially used in hard or very hard soil conditions and with large trench depths. With this method, cutting wheels loosen the existing material, which is mixed with the slurry in the trench. A mud pump anchored in the cutting frame transports the material dissolved in the slurry upwards. Then the loaded slurry passes through a desanding plant. During this step, the solids are separated from the support slurry. At the same time, the slurry is pumped back into the slurry circuit for reuse and is made available again. The excavation of the slurry-supported trench continues without interruption during this time. TRecord depths of more than 250 m have already been achieved with the BC cutters from Bauer. 

Diaphragm wall with grab

With the DHG (Diaphragm Hydraulic Grab) method, excavation is carried out in cycles. A cycle consists of inserting the grab into the trench, loosening the soil at the base and removing the dissolved soil material. Here as well, a support slurry stabilizes the open trench. After the trench is completed, joint elements and the reinforcement cage are inserted into the trench, which is concreted in an additional step. The slurry which is displaced in the process passes through the desanding plant and is fed into the slurry circuit to be reused. With Bauer’s DHG V diaphragm wall grab, trench lengths of up to 3,800 mm and trench widths of up to 1,500 mm are possible.

Download

Any questions?

I look forward to receiving your message or your call.

Franz-Werner Gerressen
Director Method Development

BAUER Cube System

为在美国平台YouTube上播放视频,我们需要您同意相关数据处理,具体内容详见我们的数据保护声明。

The BAUER Cube System opens up entirely new opportunities for the construction of diaphragm walls.

You might also be interested in: